Not planned

Bill of material in FSM

Dear,

We have the requirement to have a bill of material (from SAP B1) available in FSM, and more specific, the checklist designer.

Use case: we have sold a product, which consists of a bom with a long list of items (maybe even with serial numbers). This product will be written down a service call, and upon assembling it on site, we have a technician using a checklist to:

- confirm all items are present

- confirm serial numbers for products (by entering code + serialnumber picture) in the checklist.

Now we have to enter the full bom twice (once in the checklist and once in sap). It would be helpfull if we were able to select this BOM in our checklist, and if somethings changes in the bom, the checklist also changes.

Kind regards

 

Frederik

0

Comments

0 comments

Please sign in to leave a comment.

Didn't find what you were looking for?

New post